Records of the NRAO > New Mexico Operations Series > VLA Unit > VLA Monthly Reports Subunit > VLA Progress Report Photos

Collection Items

VLA Monthly Progress Report, November 1980 Photo
Description: At the conclusion of the VLA Dedication Ceremony: Dr. Morton Roberts, Director NRAO; Dr. Lewis M. Branscomb, Chairman of the National Science Board; Dr. Frank Press, Science Advisor to the President; Dr. Francis S. Johnson, Assistant Director, AAEO,…
Start Date: 1980-10-10

VLA Monthly Progress Report, November 1980 Photo
Description: At the conclusion of the VLA Dedication Ceremony: Dr. Frank Press, Science Advisor to the President; Governor Bruce King of New Mexico; Dr. Gerald Tape, President of Associated Universities, Inc.; and John Lancaster, Manager of VLA Construction…
Start Date: 1980-10-10

VLA Monthly Progress Report, October 1980 Photo
Description: VLA Dedication, 10 October 1980: U.S. Senator Pete Domenici at the Antenna Assembly Building
Start Date: 1980-10-10

VLA Monthly Progress Report, October 1980 Photo
Description: VLA Dedication, 10 October 1980: U.S. Senator Harrison Schmitt (right) chatting with Dr. Carl Bignell (center) and Dr. Robert Hjellming (back to camera) in the display area
Start Date: 1980-10-10

VLA Monthly Progress Report, October 1980 Photo
Description: VLA Dedication, 10 October 1980: Poster display area before the arrival of visitors
Start Date: 1980-10-10

VLA Monthly Progress Report, October 1980 Photo
Description: VLA Dedication, 10 October 1980: Dr. David Heeschen in display area
Start Date: 1980-10-10

VLA Monthly Progress Report, October 1980 Photo
Description: VLA Dedication, 10 October 1980: Dr. Morton Roberts and dignitaries on speakers platform turn to observe antenna movement at moment of dedication
Start Date: 1980-10-10

VLA Monthly Progress Report, August 1980 Photo
Description: Array in “C” configuration looking north
Start Date: 1980-08

VLA Monthly Progress Report, August 1980 Photo
Description: Array in “C” configuration looking west
Start Date: 1980-08

VLA Monthly Progress Report, July 1980 Photo
Description: Center of array in “C” configuration looking south
Start Date: 1980-07

VLA Monthly Progress Report, July 1980 Photo
Description: Center of “C” configuration looking west
Start Date: 1980-07

VLA Monthly Progress Report, July 1980 Photo
Description: View of Control Building with new Office addition on left
Start Date: 1980-07

VLA Monthly Progress Report, July 1980 Photo
Description: VLA building complex area showing new VSQ (right) and Office-Library building addition (left)
Start Date: 1980-07

VLA Monthly Progress Report, March 1980 Photo
Description: Aerial view of VLA to north on 3/30/80. Showing antennas on north arm out to 4.7 km. Buildings in foreground. Center of Wye to right center
Start Date: 1980-03-30

VLA Monthly Progress Report, March 1980 Photo
Description: Aerial view of VLA to west on 3/30/80. Showing antennas on the west arm out to 17.2 km. Antennas on west arm in foreground. Buildings in center left
Start Date: 1980-03-30

VLA Monthly Progress Report, February 1980 Photo
Description: Antenna No. 19 traveling up north arm
Start Date: 1980-02

VLA Monthly Progress Report, February 1980 Photo
Description: Antenna No. 19 crossing U.S. 60 on north arm
Start Date: 1980-02

VLA Monthly Progress Report, February 1980 Photo
Description: Antenna No. 19 approaching U.S. 60 on north arm
Start Date: 1980-02

VLA Monthly Progress Report, November 1979 Photo
Description: Aerial view of center of Wye
Start Date: 1979-11

VLA Monthly Progress Report, November 1979 Photo
Description: Aerial view east arm towards center of Wye
Start Date: 1979-11

VLA Monthly Progress Report, October 1979 Photo
Description: Placement of rail across U.S. Highway 60
Start Date: 1979-10

VLA Monthly Progress Report, October 1979 Photo
Description: View east showing road detour around construction at U.S. Highway 60
Start Date: 1979-10

VLA Monthly Progress Report, October 1979 Photo
Description: East arm earthwork, view east from station 647+00
Start Date: 1979-10

VLA Monthly Progress Report, October 1979 Photo
Description: East arm earthwork, view east from station 634+00
Start Date: 1979-10

VLA Monthly Progress Report, September 1979 Photo
Description: North arm construction preparing to cross U.S. 60
Start Date: 1979-09

VLA Monthly Progress Report, September 1979 Photo
Description: Center of Wye, September 1979
Start Date: 1979-09

VLA Monthly Progress Report, April 1979 Photo
Description: Diesel engine returning cars to load ballast for east arm construction
Start Date: 1979-04

VLA Monthly Progress Report, April 1979 Photo
Description: Pacific R.R. Construction Co. diesel engine spreading ballast on east arm construction
Start Date: 1979-04

VLA Monthly Progress Report, March 1979 Photo
Description: Aerial view of hopper cars at ballast storage area, east arm of array
Start Date: 1979-03

VLA Monthly Progress Report, March 1979 Photo
Description: Aerial view of east arm construction
Start Date: 1979-03

VLA Monthly Progress Report, February 1979 Photo
Description: Office-Library Building
Start Date: 1979-02

VLA Monthly Progress Report, February 1979 Photo
Description: Antennas near center of Wye
Start Date: 1979-02

VLA Monthly Progress Report, January 1979 Photo
Description: West arm of array
Start Date: 1979-01

VLA Monthly Progress Report, January 1979 Photo
Description: View to north – Control Building foreground, Office-Library to left
Start Date: 1979-01

VLA Monthly Progress Report, October 1978 Photo
Description: Aerial view to southwest showing antennas at center of Wye and along southwest arm
Start Date: 1978-09-15

VLA Monthly Progress Report, October 1978 Photo
Description: Aerial view to northwest of east arm of Wye showing waveguide excavation on left, track excavation and grading on right, rail and the stockpile near antenna station B37
Start Date: 1978-09-15

VLA Monthly Progress Report, September 1978 Photo
Description: Aerial view to south of center of Wye and Building complex
Start Date: 1978-09-15

VLA Monthly Progress Report, September 1978 Photo
Description: Aerial view of Array to the west – 19 antennas (one behind Assembly Building), 11 in use
Start Date: 1978-09-15

VLA Monthly Progress Report, July 1978 Photo
Description: Exterior view of the frame of the Garage Building
Start Date: 1978-08-04

VLA Monthly Progress Report, July 1978 Photo
Description: Interior view of the shell of the Cryogenics Addition to the Service Building prior to the partition work
Start Date: 1978-08-04

VLA Monthly Progress Report, July 1978 Photo
Description: Exterior view, completed shell of the Cryogenic Addition to the Service Building
Start Date: 1978-08-04

VLA Monthly Progress Report, June 1978 Photo
Description: Completed second Visiting Scientists Quarters, installation of concrete walkway underway
Start Date: 1978-06-13

VLA Monthly Progress Report, June 1978 Photo
Description: Completed Library-Office Building
Start Date: 1978-06-13

VLA Monthly Progress Report, May 1978 Photo
Description: Archaeological Area No. 1 at completion of excavation. View to northeast.
Start Date: 1978-04-01

VLA Monthly Progress Report, May 1978 Photo
Description: Archaeological Area No. 4 at completion of excavation. View to northeast.
Start Date: 1978-04-21

VLA Monthly Progress Report, May 1978 Photo
Description: Aerial view showing 17 antennas on the east and west arms
Start Date: 1978-04-28

VLA Monthly Progress Report, May 1978 Photo
Description: Aerial view of VLA buildings. Foundations for new Library-Office Building in background.
Start Date: 1978-04-28

VLA Monthly Progress Report, December 1977 Photo
Description: Aerial View of Southwest Arm of Array
Start Date: 1977-12

VLA Monthly Progress Report, December 1977 Photo
Description: Site of Building Complex looking West
Start Date: 1977-12

VLA Monthly Progress Report, October 1977 Photo
Description: Southwest View of Array
Start Date: 1977-10

VLA Monthly Progress Report, October 1977 Photo
Description: Center of Wye looking to Southwest
Start Date: 1977-10

VLA Monthly Progress Report, October 1977 Photo
Description: Aerial View of Southwest Arm of Array
Start Date: 1977-10

VLA Monthly Progress Report, April 1977 Photo
Description: Electronics Room, “D” Racks
Start Date: 1977-04

VLA Monthly Progress Report, April 1977 Photo
Description: The computer room at the VLA site in April 1977. Jim Torson is at the main console of the DEC-10, while Jon Spargo mounts a tape. Note the phone that came with the computer, built into the console so the operator could easily call for help. Barry…
Start Date: 1977-04

VLA Monthly Progress Report, April 1977 Photo
Description: Control Room
Start Date: 1977-04

VLA Monthly Progress Report, April 1977 Photo
Description: Installation of Waveguide between CN7 and CN8 (second test section which will use poured concrete)
Start Date: 1977-04

VLA Monthly Progress Report, December 1976 Photo
Description: Observations with a 5.2km baseline Commenced December 16, 1976
Start Date: 1976-12

VLA Monthly Progress Report, December 1976 Photo
Description: New L Band Feed
Start Date: 1976-12

VLA Monthly Progress Report, August 1976 Photo
Description: “L” Band Feed Manufactured by J.J. Gustincic
Start Date: 1976-08

VLA Monthly Progress Report, August 1976 Photo
Description: Landscaping at Cafeteria and Control Building
Start Date: 1976-08

VLA Monthly Progress Report, July 1976 Photo
Description: Warehouse Interior
Start Date: 1976-07

VLA Monthly Progress Report, July 1976 Photo
Description: Maintenance Building, Air Conditioning and Welding Shop
Start Date: 1976-07

VLA Monthly Progress Report, July 1976 Photo
Description: Cafeteria, Dining Area
Start Date: 1976-07

VLA Monthly Progress Report, July 1976 Photo
Description: Cafeteria, Serving Line
Start Date: 1976-07

VLA Monthly Progress Report, July 1976 Photo
Description: Control Building, Computer Room
Start Date: 1976-07

VLA Monthly Progress Report, July 1976 Photo
Description: Control Building, Second Floor Lobby
Start Date: 1976-07

VLA Monthly Progress Report, July 1976 Photo
Description: Rail Construction at Center of Wye
Start Date: 1976-07

VLA Monthly Progress Report, July 1976 Photo
Description: Antenna on SW Arm
Start Date: 1976-07

VLA Monthly Progress Report, June 1976 Photo
Description: Aerial View of Site with Center of Wye on Lower Right
Start Date: 1976-06

VLA Monthly Progress Report, June 1976 Photo
Description: Aerial View of Site Looking at SW Arm
Start Date: 1976-06

VLA Monthly Progress Report, May 1976 Photo
Description: Mechanical Equipment Room – Control Building
Start Date: 1976-05

VLA Monthly Progress Report, May 1976 Photo
Description: Antenna No. 5
Start Date: 1976-05

VLA Monthly Progress Report, May 1976 Photo
Description: East Arm to North Arm Connection
Start Date: 1976-05

VLA Monthly Progress Report, May 1976 Photo
Description: Assembly of Track at CN9
Start Date: 1976-05

VLA Monthly Progress Report, April 1976 Photo
Description: Service Building, New Warehouse Building, New Shop Building and Antenna No. 3 on Maintenance Pad
Start Date: 1976-04

VLA Monthly Progress Report, April 1976 Photo
Description: Antenna No. 4 in Assembly Building
Start Date: 1976-04

VLA Monthly Progress Report, March 1976 Photo
Description: Tie Placement along West Arm. The VLA track requires constant maintenance, with ~74 miles of steel rail and 200,000 ties that must reliably support immense weight as the 230-ton antennas (and the 90-ton transporter) travel over the track when the…
Start Date: 1976-03

VLA Monthly Progress Report, March 1976 Photo
Description: Antennas Nos. 1, 2, and 3
Start Date: 1976-03

VLA Monthly Progress Report, March 1976 Photo
Description: Antenna No. 3 on Master Pad
Start Date: 1976-03

VLA Monthly Progress Report, March 1976 Photo
Description: Shop Building Foreground and Warehouse
Start Date: 1976-03

VLA Monthly Progress Report, February 1976 Photo
Description: New Warehouse and Shop Buildings
Start Date: 1976-02

VLA Monthly Progress Report, February 1976 Photo
Description: Materials Ready for SW Arm Construction
Start Date: 1976-02

VLA Monthly Progress Report, February 1976 Photo
Description: View across Computer Room into Control Room
Start Date: 1976-02

VLA Monthly Progress Report, February 1976 Photo
Description: Antenna No. 3 in Assembly Building
Start Date: 1976-02

VLA Monthly Progress Report, January 1976 Photo
Description: View of Computer Room with Floor Installed
Start Date: 1976-01

VLA Monthly Progress Report, January 1976 Photo
Description: Antenna Support Structure for Antenna No. 3
Start Date: 1976-01

VLA Monthly Progress Report, December 1975 Photo
Description: Work in Progress in East Mechanical Room – Control Building
Start Date: 1975-12

Description: Control Room Interior
Start Date: 1975-12

VLA Monthly Progress Report, November 1975 Photo
Description: Antenna No. 1 Being Moved from the Maintenance Pad to the Pedestal Mounts at CW-5 near the Computer Trailer
Start Date: 1975-11

VLA Monthly Progress Report, November 1975 Photo
Description: Main Entrance to Control Building
Start Date: 1975-11

VLA Monthly Progress Report, October 1975 Photo
Description: Computer Trailer
Start Date: 1975-10

VLA Monthly Progress Report, October 1975 Photo
Description: Front View of Control Building
Start Date: 1975-10

VLA Monthly Progress Report, October 1975 Photo
Description: Front End Rack for Antenna No. 2 Undergoing Final Tests
Start Date: 1975-10

VLA Monthly Progress Report, October 1975 Photo
Description: Antenna No. 2 (foreground) on Master Foundation Pad, Antenna No. 1 (background) on Maintenance Pad
Start Date: 1975-10

VLA Monthly Progress Report, September 1975 Photo
Description: Cafeteria from South Side with Control Building in Rear of Photo
Start Date: 1975-09

VLA Monthly Progress Report, September 1975 Photo
Description: North Side of Control Building Showing Observation Deck
Start Date: 1975-09

VLA Monthly Progress Report, September 1975 Photo
Description: Antenna No. 2 under Fabrication
Start Date: 1975-09

VLA Monthly Progress Report, September 1975 Photo
Description: Antenna No. 1 at Maintenance Pad Undergoing Electronic Equipment Installation
Start Date: 1975-09

VLA Monthly Progress Report, August 1975 Photo
Description: Cafeteria Building
Start Date: 1975-08

VLA Monthly Progress Report, August 1975 Photo
Description: Control Building
Start Date: 1975-08

VLA Monthly Progress Report, August 1975 Photo
Description: Antenna No. 2 under Fabrication
Start Date: 1975-08

VLA Monthly Progress Report, August 1975 Photo
Description: Face of Dish of Antenna No. 1 without Feeds but with Focusing Feed Mount and Subreflector Transition installed
Start Date: 1975-08

VLA Monthly Progress Report, August 1975 Photo
Description: Installation of Focusing Feed Mount on Antenna No. 1
Start Date: 1975-08

VLA Monthly Progress Report, August 1975 Photo
Description: Antenna #1 Undergoing Servo Testing
Start Date: 1975-08

VLA Monthly Progress Report, July 1975 Photo
Description: Waveguide Installation in Manhole CW-5
Start Date: 1975-07

VLA Monthly Progress Report, July 1975 Photo
Description: Cafeteria Building, Control Building in Background
Start Date: 1975-07

VLA Monthly Progress Report, July 1975 Photo
Description: Control Building from South
Start Date: 1975-07

VLA Monthly Progress Report, July 1975 Photo
Description: Antenna No 2 Partially Assembled Pedestal in Foreground and Support Structure in Rear
Start Date: 1975-07

VLA Monthly Progress Report, July 1975 Photo
Description: Antenna No. 1 on Master Foundation Pad near Assembly Building as Afternoon Thunderstorm Approaches
Start Date: 1975-07-18

VLA Monthly Progress Report, July 1975 Photo
Description: Antenna No. 1 Being Off Loaded from Transporter onto Master Foundation Pad
Start Date: 1975-07-18

VLA Monthly Progress Report, July 1975 Photo
Description: Antenna No. 1 on Transporter Turning on Tracks to Make Turn onto Main Track
Start Date: 1975-07-18

VLA Monthly Progress Report, July 1975 Photo
Description: Antenna No. 1 on Transporter at Intersection with Main Tracks
Start Date: 1975-07-18

VLA Monthly Progress Report, July 1975 Photo
Description: Antenna No. 1 on Transporter Moving Away from Assembly Building 7/18/75
Start Date: 1975-07-18

VLA Monthly Progress Report, July 1975 Photo
Description: Antenna No. 1 in Assembly Building, Complete with Panels Ready for Move
Start Date: 1975-07

VLA Monthly Progress Report, June 1975 Photo
Description: Antenna – View of aluminum reflector panels for Antenna No. 1
Start Date: 1975-06

VLA Monthly Progress Report, June 1975 Photo
Description: Antenna – View showing start of assembly of Antenna No. 2; preassembled gear segment to right
Start Date: 1975-06

VLA Monthly Progress Report, June 1975 Photo
Description: Transporter – View of Transporter nearing completion
Start Date: 1975-06

VLA Monthly Progress Report, June 1975 Photo
Description: Antenna – View in Assembly Building
Start Date: 1975-06

VLA Monthly Progress Report, June 1975 Photo
Description: Test Set-up for Flexible Sections and Rotary Joints of Antenna Waveguide
Start Date: 1975-06

VLA Monthly Progress Report, June 1975 Photo
Description: Front End Equipment and Waveguide in Vertex Room Mock-up
Start Date: 1975-06

VLA Monthly Progress Report, June 1975 Photo
Description: Cafeteria Building, Interior View
Start Date: 1975-06

VLA Monthly Progress Report, June 1975 Photo
Description: Cafeteria Building, Placing Roof Slabs, Assembly Building in Background
Start Date: 1975-06

VLA Monthly Progress Report, June 1975 Photo
Description: Control Building, Placement of Concrete Forms for Second Floor
Start Date: 1975-06

VLA Monthly Progress Report, June 1975 Photo
Description: Control Building, Exterior View of Wall Construction
Start Date: 1975-06

VLA Monthly Progress Report, June 1975 Photo
Description: Front End Rack Installed in Mock-up Vertex Room
Start Date: 1975-06

VLA Monthly Progress Report, June 1975 Photo
Description: Feeds for the 6.0, 2.0, and 1.3cm. Bands Installed on Top of the Mock-up Vertex Room
Start Date: 1975-06

VLA Monthly Progress Report, June 1975 Photo
Description: Antenna Pedestal Being Assembled at Site
Start Date: 1975-06

VLA Monthly Progress Report, June 1975 Photo
Description: Assembled Reflector Back-up Structure
Start Date: 1975-06

VLA Monthly Progress Report, June 1975 Photo
Description: Antenna Transporter Nearing Completion
Start Date: 1975-06

VLA Monthly Progress Report, June 1975 Photo
Description: Excavation of Waveguide Trench Note Drifting Sand from Winds
Start Date: 1975-06

VLA Monthly Progress Report, June 1975 Photo
Description: Waveguide Run in Trench Ready for Test
Start Date: 1975-06

VLA Monthly Progress Report, June 1975 Photo
Description: Installing Shutter for Waveguide Test – CW-9 Manhole
Start Date: 1975-06

VLA Monthly Progress Report, June 1975 Photo
Description: Status of Cafeteria-Recreation Bldg. Construction
Start Date: 1975-06

VLA Monthly Progress Report, June 1975 Photo
Description: Status of Control Bldg. Construction
Start Date: 1975-06

VLA Monthly Progress Report, May 1975 Photo
Description: Transporter Being Assembled
Start Date: 1975-05

VLA Monthly Progress Report, May 1975 Photo
Description: Commencement of Base for Antenna No. 1
Start Date: 1975-05

VLA Monthly Progress Report, May 1975 Photo
Description: Start of Control Building Wall
Start Date: 1975-05

VLA Monthly Progress Report, May 1975 Photo
Description: Coring Manhole Wall for Waveguide Installation
Start Date: 1975-05

VLA Monthly Progress Report, April 1975 Photo
Description: Rail at the Site from Holloman Air Force Base
Start Date: 1975-04

VLA Monthly Progress Report, April 1975 Photo
Description: Preparation for the East Wall Footing of the Control Building
Start Date: 1975-04

VLA Monthly Progress Report, April 1975 Photo
Description: Antenna Elevation Shaft Mounted in the Alignment Fixture
Start Date: 1975-04

Description: Partially Completed Reflector Back Up Structure Yoke for Antenna No. 2
Start Date: 1975-04

VLA Monthly Progress Report, January 1975 Photo
Description: Six Model RP04-A Memory Disc Subsystems to the DEC-1060-E Asynchronous Computer
Start Date: 1975-01

VLA Monthly Progress Report, January 1975 Photo
Description: In December 1974, VLA construction was underway at the site: steel erection for the Antenna Assembly Building, spiking and preliminary alignment of track, and transporter weldments on location awaiting assembly. Meanwhile back in Charlottesville,…
Start Date: 1975-01

VLA Monthly Progress Report, January 1975 Photo
Description: Transporter weldments at Site awaiting assembly
Start Date: 1975-01

VLA Monthly Progress Report, January 1975 Photo
Description: Transporter weldments at Site awaiting assembly
Start Date: 1975-01

VLA Monthly Progress Report, January 1975 Photo
Description: Installation of siding on the Antenna Assembly Building
Start Date: 1975-01

VLA Monthly Progress Report, January 1975 Photo
Description: Completed Maintenance Pad showing the foundations ready for installation of the antenna base plates and the placement of rail and ties for the maintenance spur
Start Date: 1975-01

VLA Monthly Progress Report, January 1975 Photo
Description: Spiking and preliminary alignment of the track
Start Date: 1975-01

VLA Monthly Progress Report, January 1975 Photo
Description: Prefabricated Service Building
Start Date: 1975-01

VLA Monthly Progress Report, November 1974 Photo
Description: Fringe Generator Module.
Start Date: 1974-11

VLA Monthly Progress Report, November 1974 Photo
Description: IF Receiver Module.
Start Date: 1974-11

VLA Monthly Progress Report, November 1974 Photo
Description: View of weldment for center section of antenna yoke inside fabrication plant.
Start Date: 1974-11-20

VLA Monthly Progress Report, November 1974 Photo
Description: View of antenna azimuth support weldment inside fabrication plant.
Start Date: 1974-11-20

VLA Monthly Progress Report, November 1974 Photo
Description: View of completed triangular base for Antenna No. 1.
Start Date: 1974-11-20

VLA Monthly Progress Report, November 1974 Photo
Description: View of E-Systems antenna fabrication plant at Hobbs, New Mexico, belonging to Structures, Inc. Note completed antenna reflector truss parts stored in foreground.
Start Date: 1974-11-20

VLA Monthly Progress Report, November 1974 Photo
Description: View of Wye to Northeast showing ties spread and track placed but not aligned or spiked into position.
Start Date: 1974-11-20

VLA Monthly Progress Report, November 1974 Photo
Description: Steel erection at Antenna Assembly Building.
Start Date: 1974-11-20

VLA Monthly Progress Report, November 1974 Photo
Description: View of maintenance area antenna station form work and reinforcing steel. Note ballast spread in background.
Start Date: 1974-11-15

VLA Monthly Progress Report, November 1974 Photo
Description: View of Wye to Northeast showing railroad ballast. Note rail spread at left, ties to right, Antenna Assembly Building in background.
Start Date: 1974-11-15

VLA Monthly Progress Report, September 1974 Photo
Description: View of Burn Construction Company portable rock crushing and grading plant at quarry near site.
Start Date: 1974-09-10

VLA Monthly Progress Report, September 1974 Photo
Description: Antenna Assembly Building. View showing Jaynes Company portable concrete plant.
Start Date: 1974-09-26

VLA Monthly Progress Report, September 1974 Photo
Description: Antenna Assembly Building. Truck dumping concrete aggregate brought 130 miles from Albuquerque.
Start Date: 1974-09-26

VLA Monthly Progress Report, September 1974 Photo
Description: Antenna Assembly Building. View showing vibration of concrete in one deep footing.
Start Date: 1974-09-26

VLA Monthly Progress Report, September 1974 Photo
Description: Antenna Assembly Building. View showing footing excavations ready to pour. Jaynes Company concrete plant in background.
Start Date: 1974-09-26

VLA Monthly Progress Report, August 1974 Photo
Description: View of the Quarry Site showing a pile of lose rock after blasting was completed.
Start Date: 1974-08-26

VLA Monthly Progress Report, August 1974 Photo
Description: VLA Site view showing the unloading of rail and fittings from Crab Orchard Wildlife Refuge.
Start Date: 1974-08-26

VLA Monthly Progress Report, August 1974 Photo
Description: View of the VLA Site’s Southwest Arm of the Wye at Station 159 + 00 at end of the first construction contract (note the double utilization of water used in the compaction work).
Start Date: 1974-08-26

VLA Monthly Progress Report, August 1974 Photo
Description: VLA Site view of trench excavation for drainage piping at Station 154 + 00 on the Southwest Arm of the Wye.
Start Date: 1974-08-26

VLA Monthly Progress Report, July 1974 Photo
Description: Socorro, New Mexico unloading area. Showing crane unloading Crab Orchard rail from Alaskan Railroad cars. Truck in background leaving with rail for the site.
Start Date: 1974-07-25

VLA Monthly Progress Report, July 1974 Photo
Description: Crab Orchard National Wildlife Refuge, Carbondale, Illinois View showing Longwell-Scott boom truck loading rail in wooded area.
Start Date: 1974-07-25

VLA Monthly Progress Report, July 1974 Photo
Description: VLA Site showing drilling operations in quarry area prior to blasting.
Start Date: 1974-07-25

VLA Monthly Progress Report, July 1974 Photo
Description: VLA Site showing contractors water storage, well and temporary electric panel.
Start Date: 1974-07-25

VLA Monthly Progress Report, July 1974 Photo
Description: VLA Site showing Burn Construction Company earth moving equipment. Portion of 6000 wood ties shown at left.
Start Date: 1974-07-11

VLA Monthly Progress Report, July 1974 Photo
Description: VLA Site showing NRAO Office and equipment storage trailers.
Start Date: 1974-07-25

Collection Tree