Skip to main content
Archives
Search
About the NRAO/AUI Archives
NRAO/AUI Archives Policy
Finding Aids to the Collections
Finding Aid to the Papers of W. Miller Goss
Search for Items
How to Search
Popular Searches
Contact Us
About the NRAO/AUI Archives
NRAO/AUI Archives Policy
Finding Aids to the Collections
Finding Aid to the Papers of W. Miller Goss
Search for Items
How to Search
Popular Searches
Contact Us
Papers of Barry G. Clark > Green Bank Interferometer Series
Collection Items
Phase Drifts in Interferometer Observations of Point Sources, 1964
Description:
Interferometer reports
Start Date:
1964-10-00
A Method for Finding the Phase and Amplitude of Interferometer Fringe Patterns, 1964
Description:
Interferometer reports
Start Date:
1964-11-00
NRAO Interferometers: Design, Operation, and Early Results, 1964
Description:
Interferometer reports
Start Date:
1964-11-00
NRAO Interferometer: The Delay Switching Computer, 1964
Description:
Interferometer reports
Start Date:
1964-11-00
Questions for Ad Hoc Discussion Group on the Parameters for a Very-Large Antenna Array, 1964
Description:
Interferometer reports
Start Date:
1964-11-18
A Digital Cross-Correlation Interferometer, 1964
Description:
Interferometer reports
Start Date:
1964-12-01
The Response of One or More Interferometers, 1964
Description:
Interferometer reports
Start Date:
1964-12-07
Geometrical Aspects of Interferometry, 1964
Description:
Interferometer reports
Start Date:
1964-12-00
On the Reduction of Digital Interferometer Records, 1964
Description:
Interferometer reports
Start Date:
1964-12-00
Refraction, 1964
Description:
Interferometer reports
Start Date:
1964-12-00
Interferometer Calibration and Source Position Measurement Using Long-Run Phase Behavior, 1964
Description:
Interferometer reports
Start Date:
1964-12-00
On the Phase Center of a Paraboloid, 1964
Description:
Interferometer reports
Start Date:
1964-12-00
Interferometer Tape Master Files, 1965
Description:
Interferometer reports
Start Date:
1965-01-05
Technical Considerations Concerning the Location of a Third 85-Foot Telescope and an Interferometer Control Building, 1965
Description:
Interferometer reports
Start Date:
1965-01-11
The Value of B1 for Interferometer Baseline 2, 1965
Description:
Interferometer reports
Start Date:
1965-01-00
Interferometer Constants Predicted from the Survey Data, 1965
Description:
Interferometer reports
Start Date:
1965-01-00
Fitting Source Models to Interferometric Observations, I, 1965
Description:
Interferometer reports
Start Date:
1965-02-00
Interferometer Calibrations and Source Position Measurements on Baseline 2, 1965
Description:
Interferometer reports
Start Date:
1965-03-00
Sources of Error in Position Observations with the NRAO Interferometer, 1965
Description:
Interferometer reports
Start Date:
1965-03-18
Interferometer Digital Output System, 1965
Description:
Interferometer reports
Start Date:
1965-04-00
The Interferometer Fringe Reduction Program - Version II, 1965
Description:
Interferometer reports
Start Date:
1965-04-00
The Values of B1 and B3 for Interferometer Baseline 2, 1965
Description:
Interferometer reports
Start Date:
1965-04-00
Accurate Radio Source Position Measurements with the NRAO Interferometer, 1965
Description:
Interferometer reports
Start Date:
1965-07-00
Position Measurements and Baseline Constants, Baseline 5, 1965
Description:
Interferometer reports
Start Date:
1965-07-12
A Survery of Delay Line Techniques, 1965
Description:
Interferometer reports
Start Date:
1965-08-00
The Interferometer Averaging Program - AVGI, 1966
Description:
Interferometer reports
Start Date:
1966-06-06
Gain Calibration Baseline 12, 1966
Description:
Interferometer reports
Start Date:
1966-06-00
Gain Calibration Baseline 18, 1966
Description:
Interferometer reports
Start Date:
1966-06-00
Two Bit Correlator, 1966
Description:
Interferometer reports
Start Date:
1966-06-14
Correction of the InterferometerPhase for the Altitude Difference Effect, 1967
Description:
Interferometer reports
Start Date:
1967-12-18
Baseline Calibration for the Synthesis Program, 1968
Description:
Interferometer reports
Start Date:
1968-06-00
Line Interferometry, 1968
Description:
Interferometer reports
Start Date:
1968-08-01
Do Times Need to Be Corrected for Multiple Integrations for Big Fringe Periods?
Description:
Interferometer reports
Preliminary Results of the Pointing Measurements in the Summer of 1968
Description:
Interferometer reports
Start Date:
1968-11-00
Operation and Calibration of 85-1 Antenna Support Leg Temperature Monitor, 1968
Description:
Interferometer reports
Start Date:
1968-11-00
Thermal Effects of the 85' Telescope, Related to Pointing Errors, 1969
Description:
Interferometer reports
Start Date:
1969-04-00
An Analysis of the Errors in Interferometric Data, 1969
Description:
Interferometer reports
Start Date:
1969-05-00
One Bit Techniques, 1969
Description:
Interferometer reports
Start Date:
1969-07-30
Expansion of the Number of Avaliable Baselines, 1969
Description:
Interferometer reports
Start Date:
1969-09-29
Interferometer Correlator Gain Step Calibration
Description:
Interferometer reports
On the Selection of Pointing Calibrators, 1969
Description:
Interferometer reports
Start Date:
1969-10-30
Limitation in the Accuracy of the Pointing Procedure, 1969
Description:
Interferometer reports
Start Date:
1969-11-00
The Term 'AMPCOR' in the Dual-Frequency Interferometer Reduction Program and Auto Edit
Description:
Interferometer reports
Sensitivity of 2D H-line Synthesis Using the NRAO Interferometer, 1970
Description:
Interferometer reports
Start Date:
1970-11-03
Pointing of the 85ft Telescopes, 1971
Description:
Interferometer reports
Start Date:
1971-05-10
Listing of problems during run with H-line interferometer, 1971
Description:
Interferometer reports
Start Date:
1971-12-28
The Tape Recorder Interferometer and Small Diameter Radio Sources, 1972
Description:
Interferometer reports
Start Date:
1972-00-00
Site sidereal clock error, 1972
Description:
Interferometer reports
Start Date:
1972-05-12
An Improved Method for Pointing the 85-ft Antennas, 1972
Description:
Interferometer reports
Start Date:
1972-09-13
Polarization Properties of the 45' Telescope, 1973
Description:
Interferometer reports
Start Date:
1973-05-14
Updated List of Calibrators, 1973
Description:
Interferometer reports
Start Date:
1973-05-14
Report on Problems Encountered During the Recent Line Interferometer Observing Session, 1973
Description:
Interferometer reports
Start Date:
1973-10-10
The Four-Element NRAO Interferometer, a Preliminary Discussion, 1973
Description:
Interferometer reports
Start Date:
1973-11-01
Attempt to Detect Weak Absorption Features with the NRAO Interferometer Line System
Description:
Interferometer reports
Phase Stability of 35 km Baseline, 1974
Description:
Interferometer reports
Start Date:
1974-02-20
Interferometer Maintenance Logs, 1964-1966
Start Date:
1964-08-00
Telescope Operators Manual: DDP-116 Interferometer Computer, 1967
Start Date:
1967-01-03
Calibrations as of June 30, 1967
Description:
Charts and plots.
Start Date:
1967-06-30
Interferometer Failures and Replacements
Description:
Listings for 5 December 1967-30 December 1969.
Start Date:
1967-12-05
Programs for the Interferometer DDP-116 Computer, 1968
Start Date:
1968-00-00
Clark on hardware
Description:
Miscellaneous notes and memos on hardware, many undated
Start Date:
1970-00-00
Basic Instructions for Operating the Interferometer, 1975 revision
Description:
Revised version, July 1975. Original version March 1970, revised March 1971.
Start Date:
1975-07-00
Collection Tree
Papers of Barry G. Clark
Papers of Barry G. Clark > Green Bank Interferometer Series